All about RoHS exemptions: how they change, and how to keep track
· 6 min read · Certive team
Many products are RoHS compliant only because a component relies on an exemption: lead in a high-melting-point solder, in a steel or copper alloy, or in the glass of an electronic part. But exemptions aren’t permanent. They expire, get renewed with a narrower scope, or get replaced. If you don’t know which of your parts depend on which exemption, a change in the regulation can quietly make a product non-compliant.
What a RoHS exemption is
The RoHS Directive (2011/65/EU) restricts ten substances in electrical and electronic equipment: lead, mercury, cadmium, hexavalent chromium, PBB, PBDE and four phthalates. Where no reliable substitute exists yet, the EU allows specific uses anyway. These exemptions are described in two annexes:
- Annex III: lists exemptions that apply to all equipment, such as lead in certain alloys and solders.
- Annex IV: lists additional exemptions for medical devices and monitoring and control instruments.
Each exemption has a unique code, such as 6(c) or 7(a), a precisely worded scope and an expiry date. A supplier declaration that says “RoHS compliant” sometimes means “compliant using exemption X”, where X is the unique code for the exemption.
How exemptions change
Exemptions are deliberately temporary. For most equipment they are granted for up to five years, and for medical devices and monitoring and control instruments for up to seven. After that, one of a few things happens:
- Renewal. Industry can apply to renew an exemption, at the latest 18 months before it expires. The exemption stays valid while the Commission makes a decision, which can take years.
- Narrowing. An exemption is often renewed with a tighter scope. It may be split into sub-items, lower the permitted concentration, or cover only some applications or equipment categories, each with its own expiry date.
- Expiry. If no renewal is requested, the exemption simply ends on its expiry date.
- Rejection. If a renewal is refused, the exemption ends between 12 and 18 months after the decision, giving the market a transition period.
Changes are published as Commission Delegated Directives that amend the annexes. Lamps are a well-known example: many of the mercury exemptions for fluorescent lamps were not renewed and ended in 2023, forcing manufacturers to switch to other technologies.
Why this is hard to track
The difficulty isn’t only about reading the law and tracking the changes. It’s about connecting the law to your own products:
- Exemption use is buried in supplier declarations and rarely recorded at part level.
- One exemption change can affect hundreds of parts across many suppliers and products.
- Renewal decisions arrive irregularly, often long after the original expiry date.
- Scope changes are subtle: a part can still use “exemption 6(c)” but no longer fall within it.
A practical way to stay ahead
1. Record exemptions per part. When you collect RoHS declarations, ask suppliers to state which exemptions each part relies on, not just whether it is compliant.
2. Build a reverse view. For every exemption, you should be able to list the parts, suppliers and finished products that depend on it.
3. Watch the deadlines. Track expiry dates and pending renewals, and treat any delegated directive amending Annex III or IV as a trigger to review.
4. Re-confirm with suppliers early. When an exemption is narrowed or about to expire, ask the affected suppliers whether their parts still qualify or what will replace them, well before the deadline. This gives you time for unexpected issues.
5. Keep the evidence. Store each updated declaration with its date and the exemption version it refers to, so you can show an auditor what was valid and when.
How Certive helps
Certive’s RoHS compliance module turns this from a spreadsheet exercise into an automatic process:
- Exemptions captured at part level. Supplier RoHS requests ask which exemptions apply, and the answers are linked to each part in your BOM.
- Instant impact view. See every part, supplier and product that depends on a given exemption.
- Expiry alerts. Get flagged when an exemption your parts rely on is approaching expiry or has changed.
- Automatic re-requests. Certive sends updated declaration requests to exactly the affected suppliers, and AI screening checks the replies for missing or outdated information.
- Audit-ready history. Every declaration is stored with a full evidence trail, ready for a one-click report.
Sources
This article is for general information only and does not constitute legal advice. Regulatory requirements can vary by product category, market and specific circumstances.


